top of page
Search

PSA 5/15/2023 Waterline Installation between Taos St and Mills, some driveways may be blocked..

Writer: visitlasvegasnmvisitlasvegasnm

There will be a waterline installed between Taos Street, and Mills on the west side of Hotsprings. Contractors will for a short time be crossing/blocking driveways in this location, in and around Monday May 15th to 18th around 7am to 5pm....


 
 
 

Comments


City of Las Vegas, NM

© 2022 by the City of Las Vegas, NM

YouTube
  • Facebook
bottom of page