PSA 5/15/2023 Waterline Installation between Taos St and Mills, some driveways may be blocked..
- visitlasvegasnm
- May 11, 2023
- 1 min read

There will be a waterline installed between Taos Street, and Mills on the west side of Hotsprings. Contractors will for a short time be crossing/blocking driveways in this location, in and around Monday May 15th to 18th around 7am to 5pm....
Comments