top of page

PSA 5/15/2023 Waterline Installation between Taos St and Mills, some driveways may be blocked..

Writer: visitlasvegasnm
visitlasvegasnm
May 11, 2023
1 min read

There will be a waterline installed between Taos Street, and Mills on the west side of Hotsprings. Contractors will for a short time be crossing/blocking driveways in this location, in and around Monday May 15th to 18th around 7am to 5pm....


 
 
 

Comments

Rated 0 out of 5 stars.
No ratings yet

Add a rating

1700 North Grand Avenue

Las Vegas, NM 87701

505-454-1401

  • Facebook
  • YouTube
  • LinkedIn
  • TikTok
  • Instagram

City of Las Vegas, NM

© 2025 by the City of Las Vegas, NM

bottom of page