Search Results
1040 results found with an empty search
- PSA 4/19/24 Solid Waste will be Closed Today
Solid Waste Transfer Station will be closed today, Friday, April 19 due to being full.
- PSA 4/17/2024 Solid Waste Closed today
On April 17, Solid Waste will be closed due to capacity.
- PSA 4/17/2024 Reclaimed water is now available to public...
Reclaimed water is now available to public. Please download and read attached document for more details. Thank you...
- PSA 04/16/24 Asphalt Patching on El Llano Road
On April 18, Contractors will be patching asphalt on El Llano Road.
- PSA 04/15/24 Transportation Closed for Training
On Monday, April 15 Transportation will not be in operation due to staff training.
- PSA 4/18/2024 Asphalt patching on New Mexico Ave...
There will be road work on New Mexico Avenue from Rio Arriba to Valencia Street from April 8th to the 19th, Detours will be in place for safety...
- PSA 4/11/2024 Standpipe delay...
There will be a delay in maintenance on the reclaimed water standpipe due to availability of materials...
- PSA 4/3/24 A contractor will begin City storm drain repairs on Thursday, April 4th and the project will be ongoing until the anticipated completion date of Friday, May 3rd, weather permitting.
A contractor will begin City storm drain repairs on Thursday, April 4th and the project will be ongoing until the anticipated completion date of Friday, May 3rd, weather permitting. The contractor will be working Monday through Friday between the hours of 7:30 a.m. to 5:00 p.m. There wil l be partia l or complete road closures at the following locations during this time: • 5th Street (from Raynolds St. to Baca St.) • 5th Street (from th St. to 5th St.) Detours and traffic control will be in place. Please be aware and proceed with caution. Residents will have access. We thank you for your cooperation and apologize for any inconvenience this may cause. Should you require any further information please contact the City of Las Vegas Public Works Department at 505-425-3294.
- PSA 4/1/24 Solid Waste Commercial Routes Delayed
Las Vegas Solid Waste commercial routes will be delayed on Monday, April 1.
- PSA 3/29/24 - On April 1, 2024, starting at 8:00 am until 5:OO pm a contractor from the City of Las Vegas will be tying in a water line on Hot Springs Blvd and San Miguel Street.
On April 1, 2024, starting at 8:00 am until 5:00 pm a contractor from the City of Las Vegas will be tying in a water line on Hot Springs Blvd and San Miguel Street. The following areas will be impacted by either low water pressure or water outage. • San Miguel Street To avoid any inconvenience, please follow all signs for detours. We apologize for any inconvenience this may cause due to all road construction projects and thank you for your cooperation. If you require any further information, please contact the City of Las Vegas Utilities at (505) 4S4-3832.+
- PSA 4/1/2024 Legion road work Resumes...
(Weather Pending) Road construction will resume on April, 1st on Legion Drive between 7th and Grand, Detours may be expected...
- PSA 3/27/24 Solid Waste Department residential routes will be delayed from Wednesday March 27, 2024, until Friday, March 29, 2024, due to mechanical issues.
The City of Las Vegas Solid Waste Department residential routes will be delayed from Wednesday March 27, 2024, until Friday, March 29, 2024, due to mechanical issues. Please leave your rollouts curbside and they will be picked up as soon as possible. We apologize for the inconvenience. Should you require any further information, please contact the Solid Waste Department at (505) 429-8340.
















