top of page
Search


PSA 3/21/24 Public Works working on a street cut on North Gonzales.
On March 21, Streets Department will be working on a street cut on 2425 North Gonzales.

visitlasvegasnm
Mar 21, 20241 min read


PSA 3/14/24 Solid Waste Will be Closed March 14
Las Vegas Solid Waste will be closed March 14 until March 18.

visitlasvegasnm
Mar 14, 20241 min read


PSA 3/13/24 Contractor will be Replacing Water Line on El Llano Road
On March 20 and 21, Las Vegas Contractor will be replacing a water line on El Llano Road.

visitlasvegasnm
Mar 14, 20241 min read


PSA 3/13/24 Contractor Tying Water Line on Hot Spring Blvd
On March 18, City of Las Vegas Contractor will be tying water line on Hot Springs Blvd.

visitlasvegasnm
Mar 14, 20241 min read


PSA 3/13/24 Construction will Resume on Legion Drive
On March 25 Desert Fox will resume construction on Legion Drive from 7th Street to Grand Ave.

visitlasvegasnm
Mar 14, 20241 min read


PSA 3/12/24 Contractor Tying in Water Line on New Mexico Ave.
From March 13 to March 15, Las Vegas Contractor will be tying in a water line on New Mexico Ave.

visitlasvegasnm
Mar 12, 20241 min read


PSA 3/11/24 Solid Waste will be Closed Due to Being Full
Las Vegas Solid Waste will be closed on March 11 due to being full.

visitlasvegasnm
Mar 11, 20241 min read


PSA 3/8/24 Solid Waste Transfer Station Closing at Noon.
Las Vegas Solid Waste Transfer Station will be closing today at noon due to being full.

visitlasvegasnm
Mar 8, 20241 min read


PSA 3/8/24 Wonders on Wheels at Carnegie Library
Wonders on Wheels will be at Carnegie Library on March 27

visitlasvegasnm
Mar 8, 20241 min read


PSA 3/7/24 Water Division will be installing Water Line from East University to Olguin St.
Las Vegas Water Division will be installing Water Line on Pecos Street between East University Street and Olguin Street on March 24.

visitlasvegasnm
Mar 7, 20241 min read


PSA 3/7/24 Water Division will be installing Water Line on Pecos Street
Las Vegas Water Division will be installing Water Line on Pecos Street from March 12 to March 15.

visitlasvegasnm
Mar 7, 20241 min read


PSA 3/5/24 Side and Front Load Commercial Routes Delayed.
The Solid Waste Department front loader and side loader commercial trash routes are delayed between March 5 and March 9.

visitlasvegasnm
Mar 6, 20241 min read


PSA 2/29/24 Temporary City Office Locations
During City Hall temporary closure, the following staff will be at these locations.

visitlasvegasnm
Mar 4, 20241 min read


PSA 3/4/24 Contractor installing Water Lines
Starting March 11, a contractor for the City of Las Vegas will be installing water lines on Hot Springs Blvd.

visitlasvegasnm
Mar 4, 20241 min read


PSA 2/28/2024 Flushing Fire Hydrants...
The City of Las Vegas will be flushing fire hydrants between March 1st and the 15th. Water pressure, and color may vary...

visitlasvegasnm
Feb 29, 20241 min read


PSA 2/27/24 Water Line Install on Hot Springs Blvd.
Starting March 4, City contractor will be installing a water line from Mills Ave. to Mora Street.

visitlasvegasnm
Feb 28, 20241 min read


PSA 2/29/2024 Frontage Road Waterline work...
There will be some waterline work on South Commerce which may cause water outages or low water pressure in this area. The work will begin...

visitlasvegasnm
Feb 27, 20241 min read


PSA 2/26/2024 Detours on 700 block Creston...
Their will be gas line repairs on the 700 block of Creston this road will be closed and detours will be in place...

visitlasvegasnm
Feb 27, 20241 min read


PSA 2/21/24 Gas Division Repairing Gas Line
City Gas Division will be repairing a gas line on the 700 Block of Creston Circle.

visitlasvegasnm
Feb 21, 20241 min read
bottom of page






