PSA 11/1/24 Line Replacement Project on Santa Anna and Lopez Streets
PSA 10/28/24 IMPORTANT INFORMATION ABOUT YOUR DRINKING WATER
PSA 10/18/24 Public access to reclaimed water to End
PSA 10/7/24 POOL CLOSURE NOTICE
PSA 10/4/24 Closure of Rec Center for Indigenous People Day
PSA 9/23/24 Water Division will be installing a two-inch water valve
PSA 9/20/24 LAS VEGAS RECEIVES THE NEW MEXICO LAND AND WATER CONSERVATI ON, STATE OF NEW MEXICO ENERGY AND MINERALS AND NATURAL RESOURCES GRANT
PSA 9/19/24 Contractors will be connecting a water line
PSA 9/10/2024 Solid Waste Department commercial routes will be delayed
PSA 9/10/24 Las Vegas contractor will be connecting three main water lines
PSA 9/4/24 ROAD CLOSURE
PSA 8/30/24 Pool to Re-open September 3rd
PSA 08/29/24 Abe Montoya Closed Labor Day
PSA 8/28/24 Contractor will be connecting a main water line San Miguel Street
PSA 8/28/29 Contractor will be connecting a main water line
PSA 8/27/24 San Miguel Street area may experience low water pressu re or a water outage during this time
PSA 8/27/24 Contractor will begin tying in a water main on Hot Springs Boulevard
PSA 8/22/24 City of Las Vegas contractor will begin asphalt paving on Independence Avenue